Dorra 2B, Central Gathering Platform (CGP) Reconfiguration Design

CLIENT:                             Larsen & Toubro Energy Hydrocarbon (LTEH)

DATE OF START:           Dec 2025

WEIGHT:                          Topside NTE 33000 tons, Jacket Dry Weight 6014 tons

LOCATION:                     150 km Northwest of Abu Dhabi City, Persian Gulf

 

SOW: OTL performed the engineering reconfigure design for this Jacket and Topside including:

·         Jacket In-place strength analysis

·         Jacket Transportation Structural analysis

·         Jacket Submerged Lifting analysis

·         Jacket Mating Analysis

·         Jacket On-bottom Stability analysis with Mudmat design

·         Pile Drivability analysis