Engineering Software Development

OTL has been awarded a contract to develop a couple engineering software tools to perform fatigue analysis for fixed offshore wind structures connecting the capabilities between Bladed and SACS, and for transitioning structure between wind turbine and the supporting platform based on ANSYS finite element method.

Floating Wind TLP Preliminary Design Completed

In 8 weeks, OTL has performed sufficient engineering and finished the preliminary design of the floating wind TLP located in 60 m water depth in South Chia Sea with a 15 MW wind turbine. The design, backed up by time-domain coupled wind turbine and floater analysis methodology and with all critical conditions in the consideration, has proven the feasibility of the TLP concept by OTL, and its superior economic performance over other floating concepts.

Floating Wind Preliminary Design Started

OTL started a preliminary design for a floating wind with 15 MW wind turbine in 60 m water depth based on TLP concept. The floating wind TLP will be operating in South China Sea harsh environment. Coupled with the sizable wind turbine and relative shallow water, OTL foresees challenges in the coming design process but is confident on providing a feasible and economical solution to the client.