CLIENT: Larsen & Toubro Energy Hydrocarbon (LTEH)
DATE OF START: Dec 2025
WEIGHT: Topside NTE 25000 tons, Jacket Dry Weight 4720 tons
LOCATION: Between Kuwait and Saudi Arabia, Persian Gulf
SOW: OTL performed the engineering reconfigure design for this Jacket only including the Jacket In-place strength analysis as the transportation and lifting and mating analysis are the like CGP jacket.