CLIENT: Larsen & Toubro Energy Hydrocarbon (LTEH)
DATE OF START: Dec 2025
WEIGHT: Topside NTE 45000 tons, Max 2540 tons (for Jacket)
LOCATION: 150 km Northwest of Abu Dhabi City, Persian Gulf
SOW: OTL performed the engineering reconfigure design for this Jacket and Topside including:
· Jacket In-place strength analysis
· Jacket Transportation structural analysis
· Jacket Lifting analysis
· Jacket Mating Analysis
· Topside In-place strength analysis
· Topside Transportation structural analysis