CLIENT: Larsen & Toubro Energy Hydrocarbon (LTEH)
DATE OF START: April 2024
WEIGHT: Max 6661 tons (for Topside), Max 3455 tons (for Jacket)
LOCATION: QG North Field, Persian Gulf
SOW: OTL performed the engineering reconfigure design for this Jacket and Topside including:
Jacket In-place strength analysis
Jacket Loadout analysis
Jacket Transportation analysis (both marine and structural)
Jacket Lifting analysis
Jacket Flotation/Upending analysis
Jacket Mating Analysis
Topside In-place strength analysis
Topside Mating analysis