Pemex PG-HA-PIT-A Non-Drilling Platform

CLIENT:                             CPI Engineering, Mexico

DATE OF START:           August 2014

WEIGHT:                          Max 9540 tons (for Topside), Max 7000 tons (for Jacket)

LOCATION:                     Gulf of Mexico

SOW: OTL performed the engineering detailed design for this jacket including:

  • In-place static and dynamic analysis

  • In-place spectra fatigue analysis

  • In-place seismic analysis

  • Jacket Loadout analysis

  • Jacket transportation analysis (both marine and structural)

  • Jacket launch analysis (both marine and structural)

  • Jacket Flotation/Upending analysis

  • Jacket on-bottom stability analysis, mudmat capacity, and stress check

  • Pile free-standing and pile drivability analysis

  • FE analysis for skirt pile sleeve connection

  • Member stress check under slamming loads (in-place and launch)

  • Member ViV check (both in-service and pre-service conditions)

  • Launch cradle design check and local ring reinforced joints strength check

  • Hydrostatic ring design check

  • Joint Design with Inner Stiffening Ring Design