• Welcome
    • Our Company at a Glance
    • Client Portfolio
    • Fixed Platforms
    • Floating Platforms
    • Floatover Installation
    • Brownfield Engineering
    • Advanced Engineering
    • Offshore Wind
  • Projects
  • Contact Us
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
Menu

OffshoreTech, LLC

Engineering Offshore Solutions
  • Welcome
  • About Us
    • Our Company at a Glance
    • Client Portfolio
  • Services
    • Fixed Platforms
    • Floating Platforms
    • Floatover Installation
    • Brownfield Engineering
    • Advanced Engineering
    • Offshore Wind
  • Projects
  • Contact Us
  • News
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
fish_farm.PNG

Loadout, Transportation and Installation of Offshore Fish Farm

September 24, 2020
fish_farm.PNG

Client: Xinji Shipping, China

Date of Completion: 2020

Location: Fujian

SOW and Facts: Loadout, transportation and installation of Haixia I fish farm, the scope includes, but not limited to:

·     Review of design documents
·     Inspect of quay conditions for loatout operations
·     Approval of environmental conditions at quay and tow route
·     Development of ballast plan for loadout and transportation
·     Loadout structural strength evaluation
·     Transportation structural strength evaluation/support/seafastening
·     Transport and installation aids design
·     Transport and offloading stability analysis
·     Mooring installation procedures and analysis
·     Vessel and tug spec definition
·    Design of link beam, seafastening, floatoff stability, supports of fish farm on HTV etc.