• Welcome
    • Our Company at a Glance
    • Client Portfolio
    • Fixed Platforms
    • Floating Platforms
    • Floatover Installation
    • Brownfield Engineering
    • Advanced Engineering
    • Offshore Wind
  • Projects
  • Contact Us
    • 2025
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
Menu

OffshoreTech, LLC

Engineering Offshore Solutions
  • Welcome
  • About Us
    • Our Company at a Glance
    • Client Portfolio
  • Services
    • Fixed Platforms
    • Floating Platforms
    • Floatover Installation
    • Brownfield Engineering
    • Advanced Engineering
    • Offshore Wind
  • Projects
  • Contact Us
  • News
    • 2025
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
Okwok.PNG

Oriental Okwok Topside Transportation and Installation

September 24, 2020
Okwok.PNG

Client: Oriental Energy Resources

Date of Completion: 2019

Location: GOM to West Africa

SOW and Facts: Okwok WHP Topside transportation and installation, the scope includes but not limited to:

·    Seafastening design
·    Loadout analysis
·    Transportation analysis
·    lifting analysis
·    Installation procedure
·    Moblization of HLV
·    Topside installation and close out

← Bayu-Undan Decommissioning Concept StudyTransportation Analysis for Chevron →
Back to Top