Client: CNOOC SHENZHEN
Date of Completion: 2023,2024,2025
Location: China, Shenzhen
SOW and Facts: Float-over Independent Verification Analysis Services (HZ26-6 DPP, XJ30-2 DPPB, HZ25-8 DPPB platforms)
1) Review of Design Basis
2) Review of Deck Float-over Plan and Methodology Study
3) Review of Deck Float-over Installation Specification
4) Review of LMU Specification
5) Review of DSU Specification
6) Review of Barge Fender Specification
7) Independent Verification of Deck Loadout Study
8) Independent Verification of Deck Transportation Analysis
9) Independent Verification of Barge Global Longitudinal Strength Check
10) Independent Verification of Floatover Mating Analysis
11) Independent Verification of Entry and Exit Analysis
12) Independent Verification of Miscellaneous Analyses
13) Independent Verification of DSU Connection Local Structure Strength Analysis
14) Review of loadout, transportation, floatover, LMU, DSU,etc. drawings