OTL has been awarded a project by a prominent international EPCI contractor to perform a bid engineering of a heavy offshore platform requiring floatover installation with complicated foundation issues. The work includes the optimization of the topside structure and the jacket in order to suit the changed design parameters and the floatover vessel.