Floating Wind TLP Preliminary Design Completed

In 8 weeks, OTL has performed sufficient engineering and finished the preliminary design of the floating wind TLP located in 60 m water depth in South Chia Sea with a 15 MW wind turbine. The design, backed up by time-domain coupled wind turbine and floater analysis methodology and with all critical conditions in the consideration, has proven the feasibility of the TLP concept by OTL, and its superior economic performance over other floating concepts.