CPEC Offshore Platform Transportation and Installation Study Reviewed

CPEC has conducted the mid-term review of OTL’s works on the offshore platform transportation and installation study. OTL’s responsibilities include a wide range of scope of works on offshore platforms of different sizes and different locations with different installation methods. OTL has successfully passed the mid-term review with high regard.