OTL Assisted Successful Fish Farm Installation

OTL has been awarded a contract in late 2019 to assist the client for the loadout, transport and installation of a very large cylindrical fish farm. OTL is responsible for the conceptual design and the detailed design of the said scope of works. The fish farm was loaded-out from fabrication yard onto a semi-submersible vessel by SPMT method, dry transported to the fish farm site, offloaded when the appropriate weather window become available and subsequently completed the mooring system installation.