A Fresh Start in Year 2020: Kick-off LF15-1 Deepwater Jacket Detailed Design Verification

OTL has previously been awarded the third party verification contract by ABS/CCS/CNOOC Shenzhen. The work scope includes independent modeling and analysis of the LF15-1 deepwater jacket in 286 m water depth for the FEED and Detailed Design, as well as review and verification of all specifications and drawings. Verification of the FEED design has been completed in October 2019. CNOOC Shenzhen project personnel has met with OTL project team on Jan. 2, 2020 to kick-off the detailed design verification scope for the LF15-1. OTL will start the project as soon as detailed design data become available.