Client: Shall/Seatrium
Date of Completion: April 2026
SOW and Facts:
•Topside loadout engineering
•Skid beam and seafastening design
•Floatover installation engineering
•Surge and sway fender design
•Loadout operation support
•Floatover operation support
Location: West Australia
Weight: Topside 12,500 metric tons