• Welcome
    • Our Company at a Glance
    • Client Portfolio
    • Fixed Platforms
    • Floating Platforms
    • Floatover Installation
    • Brownfield Engineering
    • Advanced Engineering
    • Offshore Wind
  • Projects
  • Contact Us
    • 2026
    • 2025
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
Menu

OffshoreTech, LLC

Engineering Offshore Solutions
  • Welcome
  • About Us
    • Our Company at a Glance
    • Client Portfolio
  • Services
    • Fixed Platforms
    • Floating Platforms
    • Floatover Installation
    • Brownfield Engineering
    • Advanced Engineering
    • Offshore Wind
  • Projects
  • Contact Us
  • News
    • 2026
    • 2025
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
Picture3.jpg
Picture2.jpg
Picture1.jpg

CRUX Topside Transportation and Installation

April 23, 2026

Client: Shall/Seatrium

Date of Completion: April 2026

SOW and Facts:

•Topside loadout engineering

•Skid beam and seafastening design

•Floatover installation engineering

•Surge and sway fender design

•Loadout operation support

•Floatover operation support

Location: West Australia

Weight: Topside 12,500 metric tons

Floatover Installation Manual →
Back to Top