OTL has received a LOI from a major EPCI contractor to start basic design of multiple offshore platforms. OTL is requested to re-configure the previous platform designs to suit for the EPCI contractor’s installation resources to be competitive. OTL will work on the modification of two platforms, each include complete scopes of re-configuration and re-design of the topside and jacket structures, in a progressive manner.