OTL has recently acquired multiple work orders from Murphy Oil to assist Murphy Oil’s expansion on Front Runner Spar Platform located in Gulf of Mexico. OTL will perform a FEA strength and fatigue analysis to study the feasibility of using the existing future I-Tube connection for a SCR subsea tie-back. OTL will also verify the topside deck strength and particularly the capping beam strength for the new workover rig to be used on the platform.